Panel 1
Greg: Is this right? We’re going to need fifty-five two-by-fours for the set?
Liz: Yep - it’s gonna make a neat asymmetrical framing backdrop. Plus all the wood for the platform.
Panel 2
Greg: I’m sure it will be lovely, but this combined with the plywood we’re getting and the other lumber, and it’s getting close to a thousand pounds of wood.
Liz: So what? The stage doesn’t have a weight limit or anything.
Panel 3
Greg: No, but I DO. I’m going to have to be the one loading the truck and unloading it at the theater on tech sunday, and I don’t have a hand cart or anything!
Liz: I think you’re forgetting something.
Greg: Oh? What’s that?
Panel 4
Liz: We need to pre-build a bunch of stuff at home on Saturday so we can get things done early on sunday.
Liz: So you actually need to load and unload it twice.
Greg: OH WELL IN THAT CASE IT’S FINE.
Greg: Is this right? We’re going to need fifty-five two-by-fours for the set?
Liz: Yep - it’s gonna make a neat asymmetrical framing backdrop. Plus all the wood for the platform.
Panel 2
Greg: I’m sure it will be lovely, but this combined with the plywood we’re getting and the other lumber, and it’s getting close to a thousand pounds of wood.
Liz: So what? The stage doesn’t have a weight limit or anything.
Panel 3
Greg: No, but I DO. I’m going to have to be the one loading the truck and unloading it at the theater on tech sunday, and I don’t have a hand cart or anything!
Liz: I think you’re forgetting something.
Greg: Oh? What’s that?
Panel 4
Liz: We need to pre-build a bunch of stuff at home on Saturday so we can get things done early on sunday.
Liz: So you actually need to load and unload it twice.
Greg: OH WELL IN THAT CASE IT’S FINE.